BanKok_MRT

CONTRACTOR: BCKT JV (BILFINGER+BERGER, CH.KARNCHANG, KUMAGAI, TOKYU)
PERFORMANCE BY: GEOTECH/JOVIAN TAIWAN/LEO JOVIAN THAI JV
MRTA-SOUTH project include six stations (HuaLamPhong,SamYan, Bonkai,
Lumphini, Silom, Sirikit) and five Shield Machine Method Tunnel (Bon-Sir,
Hua-Sam, Lum-Bon, Sam-Sil, Sil-Lum).

Installation and Measurement the Bench Mark, Settlement Points, Inclinometer System,
Observation Well, Piezometer, Earth Pressure Cell, Strain Gauge, Reinforcing Bar Stress
Transducer, Extensometer, Tiltmeter, Crackmeter, Heave Indicator and etc.
) Supply data base management software – MRT DBMS

BANGKOK MRTA INITIAL SYSTEM PROJECT UNDERGROUND STRUCTURE - NORTH MONITORING SYSTEM

CONTRACTOR: ION JV ( ITALIAN THAI, OBAYASHI, NISHIMATSU )

MRTA-NORTH project include eleven stations (Thiam Ruam Mit, Pracharat
Bamphen, Sutthisan, Ratchada, Latphrao, Phahonyothin, Mo chit, Kamphaeng,
Bang Su) and nine Shield Machine Method Tunnels.

Supply data base management software – MRT DBM

Posted in .

Leave a Reply

Your email address will not be published. Required fields are marked *