Cases

  • TAIWAN HIGH SPEED RAILWAY C210 PROJECT

    TAIWAN HIGH SPEED RAILWAY C210 PROJECT – AUTOMATIC MONITORING SYSTEM CONTRACTOR: OBAYASHI – FUTSU JVTHSR C210 project include Linkou Tunnel, Shift A, and Shift B.→Instruments – Extensometer, Pressure Cell, Stain Gauge, and Measure Anchor Installation→Supply Datalogger and Multiplexer→ Supply automatic transfer software – GEOAUTO for automatic monitoring system→ Supply data base management software – DBMS…

  • TAIWAN HIGH SPEED RAILWAY C215 PROJECT – AUTOMATIC MONITORING SYSTEM

    CONTRACTOR: OBAYASHI – FUTSU JVTHSR C215 project include Taoyeng Tunnel.● Instruments – Extensometer, Pressure Cell, Stain Gauge, and Measure Anchor Installation● Supply Datalogger and Multiplexer● Supply automatic transfer software – GEOAUTO for automatic monitoring system● Supply data base management software – DBMS include 3-D data management. CONFIGURATION DIAGRAM OUTPUT FORMAT

  • Taiwan South 2nd Free Way Kau-Pin Bridge – Automatic Monitoring System

    ● Main Contractor: Japan Daisei/Pan Asia JV.● Instruments include Rebar Gage, Strain gage, Strand Meter, Tilt meter, Concrete Straingage, Wind speed/direction meter, seismograph, temperature gage, optical totalstation…, Automatic Monitoring System.● Automatic Monitoring & Database Software ( GEOAUTO-CR10 Software ). GeoAuto Software System Structure

  • TAIWAN HIGH SPEED RAILWAY C215 PROJECT – AUTOMATIC MONITORING SYSTEM

    CONTRACTOR: OBAYASHI – FUTSU JVTHSR C215 project include Taoyeng Tunnel.

  • Taiwan High Speed Rail C220 -Shin Chu Tunnel Under Pass 2nd Free Way

    This Project is a Fully Automatic Monitoring System, theTaiwan High Speed Rail - Shin Chu Tunnel Under Passing theNorth 2nd Free Way ( 10~12 m depth from the Free Way groundsurface ),In order to keep away from the settlement of Free Way,we design the 24 hour, real time display, alarm active, Multi-PointMonitoring System (including Single/Multi…

  • BanKok_MRT

    CONTRACTOR: BCKT JV (BILFINGER+BERGER, CH.KARNCHANG, KUMAGAI, TOKYU)PERFORMANCE BY: GEOTECH/JOVIAN TAIWAN/LEO JOVIAN THAI JVMRTA-SOUTH project include six stations (HuaLamPhong,SamYan, Bonkai,Lumphini, Silom, Sirikit) and five Shield Machine Method Tunnel (Bon-Sir,Hua-Sam, Lum-Bon, Sam-Sil, Sil-Lum). Installation and Measurement the Bench Mark, Settlement Points, Inclinometer System,Observation Well, Piezometer, Earth Pressure Cell, Strain Gauge, Reinforcing Bar StressTransducer, Extensometer, Tiltmeter, Crackmeter, Heave…