Project name: Taiwan South 2nd Free Way Kau-Pin Bridge – Automatic Monitoring System

Project location:

Start time: 1997

Complete time: 2002

Project description:

Project details:

 
  1. Main Contractor: Japan Daisei/Pan Asia JV.
  2. Instruments include Rebar Gage, Strain gage, Strand Meter, Tilt meter, Concrete Strain gage, Wind speed/direction meter, seismograph, temperature gage, optical total station, GPS, EM sensor, Automatic Monitoring System.

Copyright © 2018 Geotech Science. All Rights Reserved Website được thiết kế bởi Tất Thành